Road work ahead
Published: November 15, 2009
Culpeper County
* Route 229 from Duke Street to Route 684: Widening from two to four lanes. Motorists should be alert for signs and traffic controls as they approach the work zone. Lane closures possible.
* Route 3 from milepost 7.44 to 7.40: Paving. Traffic will be restricted through the work zone. Motorists should be alert for equipment and workers near the travel lane.
* Bus. 29 at Route 666: Paving. Traffic will be restricted through the work zone.
Fauquier County
* Interstate 66 (milepost 26 to 20 westbound): Guardrail replacement and shoulder improvements, 7 a.m. to 3 p.m., Monday through Friday. Alternating left and right lane closures, motorists should expect congestion and brief delays.
* Dumfries Road: Roadway improvements. Traffic pattern has changed westbound between Mill Run Road and Graves Mill Road. Lane closures and delays expected between 7 a.m. and 5 p.m.
* Interstate 66 (milepost 27) bridge over Route 721: Lane closures expected both ways. Motorists should expect signs advising of detour and the traffic pattern changes as they approach the work zone.
* U.S. 211 at Walker Drive/North Hill Drive: New traffic signal. Motorists should be alert for new traffic pattern.
* U.S. 17 from railroad tracks to Route 840: Paving. Traffic will be restricted through the work zone.
* Kelly Road bridge over South Run: Closed for eight weeks due to replacement. Detour route is posted.
Louisa County
* Route 33 from U.S. 15 to Route 22: Paving during daylight hours. Brief delays are likely due to lane restrictions.
Orange
* Route 643: Milling and paving during daylight hours. Traffic will be controlled by flaggers and pilot truck. Motorists should expect delays and be alert for signs and traffic controls as they approach the work zone.
Advertisement


Advertisement